Name of work :
Construction of Bridge over River Tubarão, at the connection between Rua Padre Nóbrega and Rua Uruguai, in Tubarão/SC
Type of work:
OAE-Pont
Quantity/volume:
1. Foundation: Ø 33 and 42 cm precast centrifuged piles - total length 5,310.00 m
2. Total volume (concrete): 2,331.09 m³
3. Prestressed precast beams: 66 und - length 20,00 and 25,00 m
Execution deadline :
18 months (under execution)
Type of equipment used :
220 ton crane.
Total span :
142.40 m / Total width: 22.60 m