Name of work :
Construction of Bridge over the Taquaruçu River, located on the link road of Avenida Atílio Fontana, SCT-480, in Chapecó/SC
Type of work:
OAE-Pont
Quantity/volume:
1. Foundation: Footings
2. Total volume (concrete): 1,551.00 m³
3. Prestressed precast beams: 30 und - length 25.01 to 26.60 m
Execution deadline :
24 months
Type of equipment used :
Truss crane cap. 700 ton.
Total span :
130.33 m / Total width: 11.57 m