Works Pelotas Bypass - Pelotas/RS

Name of work :
Execution of Bridge over Santa Barbara Channel (LE), Viaduct at the Intersection with BR-293 and BR-392 (LE+LD), Viaduct over Herbert Hadler Avenue Access (LE+LD), Viaduct over BR-116 at the access to Cidade de Lisboa Avenue and Intersection Viaduct at BR-116 with BR-392, in Pelotas/RS

Type of work:
OAE-Viaduct / OAE-Pont

Quantity/volume:
Bridge over the Santa Barbara Canal (LE)
1. Foundation: metallic piling - total length 608.00 m
2. Total volume (concrete): 482.00 m³
3. Precast prestressed beams: 15 und - length 17.65 m and 18.90 m
4. Total span: 55.00 m / total width: 13.00 m

Viaduct at the Intersection with BR-293 and BR-392 (LE+LD)
1. Foundation: Ø 70 cm hollow piles - total length 1,424.00 m
2. Total volume: 993.31 m³
3. Pre-molded prestressed beams: 30 und - length 27.00 m
4. Total span: 81.00 m / total width: 28.01 m

Viaduct over the Herbert Hadler Avenue Access (LE+LD)
1. Foundation: Ø 70 cm hollow piles - total length 960.00 m
2. Total volume: 1,107.10 m³
3. Pre-molded prestressed beams: 24 und - length 27.00 m
4. Total span: 81.00 m / total width: 22.81 m

Viaduct over BR-116 at the access to Avenida Cidade de Lisboa
1. Foundation: Ø 80 cm hollow piling - total length 1,056.00 m
2. Total volume: 1,437.00 m³
3. Beams: 03 und - length 43.80 m
4. Total span: 43.80 m / total width: 16.80 m

Intersection Viaduct between BR-116 and BR-392
1. Foundation: Ø 70 cm hollow piles - total length 828.00 m
2. Total volume: 951.00 m³
3. Beams: 04 und - length 52.50 m
4. Total span: 52.50 m / total width: 20.61 m

Deadline for execution :
15 months

Type of equipment used :
220 ton crane.