Name of work :
Implementation of the intersections of priorities 1 and 2 located on BR-277, km 104 (I04) and km 106 (I06), in Campo Largo/PR, with implementation of special artwork, earthworks, paving, contention, drainage, landscaping, signage, implementation of footbridge

Type of work:
OAE-Viaduct / OAE-Passarela / Reinforced Earth

Quantity/volume:
Intersection I04 - km 104 - OAE-Viaduct
1. Foundation: Ø 41 cm root pile - total length 636.00 m
2. Total volume: 313.53 m³
3. Pre-moulded prestressed beams: 12 und - length 22.60 m
4. Total span: 45.60 m / total width: 15.66 m

Intersection I04 - km 104 - Reinforced earth wall
1. concrete slabs: 843,53 m²
2. Soil reinforcement with precast centrifuged piles Ø 38 cm - total length 4,572.00 m

Intersection I04 - km 104 - Stapled soil (km 104+577.26 to km 104+677.26)
1. Length: 100.00 m
2. Height: 2,15 m
3. Staples: 348,00 m

Intersection I04 - km 104 - Bending wall (km 2+540 to km 2+610)
1. Total volume: 66.00 m³

Intersection I06 - km 109 - OAE-Viaduct
1. Foundation: Ø 41 cm root pile - total length 504.00 m
2. Total volume: 326.40 m³
3. Pre-moulded prestressed beams: 12 und - length 19.80 m
4. Total span: 39.60 m / total width: 15.95 m

Intersection I06 - km 109 - Reinforced earth wall
1. concrete slabs: 1,531.82 m²
2. Soil reinforcement with root piles (Ø41 cm total length 1,080.00 m), reinforced concrete capitals and geogrid

Intersection I06 - km 109 - Anchored Curtain
1. Volume: 53,76 m³
2. Staples: 621.00 m

Intersection I06 - km 109 - Anchored Curtain
1. Volume: 261,85 m³
2. Anchoring with tie-rods Ø 40mm - total length 1,805.00 m

Intersection I06 - km 109 - Bending wall
1. Total volume: 422.37 m³

Intersection I06 - km 109 - OAE-Passarela
1. Foundation: Root pile Ø 31 cm - total length 461.00 m
2. Total volume: 200.88 m³
3. Prestressed precast beams

  • Ramp - 14 und - length 9.60 m
  • Catwalk - 02 und - length 22,00 m

4. Total length of ramps: 81.20 m
5. Total length of walkway: 44.50 m

Execution time :
10 months

Type of equipment used :
220 ton crane / Pile driver / Driller (Stapled soil / Tie rods)